Since the architecture,
engineering and construction (AEC) business faces tremendous pressure to provide
optimal projects within strict deadlines, improving process efficiency and
reducing rework is unquestionably the need of the actual hour. The design and
construction-related rework is among the critical factors that negatively
affect productivity, profitability as well as timely completion of tasks for
both contractors as well as owners. Besides, it effects designers,
subcontractors, MEP (M&E) technical engineers, consultants and the whole
downstream chain. In comparatively larger and much more complex projects, the
design-build rework can negatively influence the whole project workflow, delay
task delivery, and cost a lot more than what was originally believed.
As mep
coordination drawings, electrical, and plumbing systems take
into account a significant value from the project, the prudent utilization of
building information modeling (BIM) resources to effectively coordinate MEP
(M&E) techniques helps reduce rework as well as increase productivity. On another
hand, the lack of well-planned interdisciplinary MEP (M&E) coordination
leads to duplication of efforts, main interferences and design clashes upon
site, as well because fabrication changes and mistakes.
Since BIM requires
thorough pre-construction planning and multidisciplinary coordination, its
adoption through the MEP (M&E) team raises technical interoperability among
numerous members during building providers coordination. In BIM-led MEP
(M&E) coordination, creating services designers, consultants, and
subcontractors are participating during the design as well as planning stage.
One of the very crucial factors for a highly effective and accurate
coordination exercise is to select a specific protocol with regard to creating
virtual architectural, structural, mechanised, electrical, plumbing and fire
protection types of the same facility. Consequently, the team should agree with
mechanisms to merge the actual models from different trades and produce a
combined coordinated services MEP design.
For instance, the
designers use design development drawings
application to organize architectural BIM models which accurately represent
elements, for example walls, doors, windows, ceilings, as well as casework.
Furthermore, each of these elements has a variety of parameters, including
thickness, elevation, materials, and texture, amongst others. Using this
architectural model like a reference point, a structural model is going to be
created using Revit Framework which features vertical as well as horizontal
structural framing, fundamentals, and slabs.
Subsequently, the
actual MEP (M&E) contractors as well as subcontractors design separate
versions for mechanical, electrical, Engineered
Drawings
as well as plumbing systems using three dimensional MEP modeling software (such
because Autodesk MEP and Revit MEP). Generally, the mechanical models consist
of HVAC ducts, piping assemblies, hangers, diffusers, as well as pipe insulation,
to name several. The electrical models may represent details concerning
conduits (feeder as well as underground), junction boxes, illumination systems,
cable/wire bundles, as well as cable trays, amongst other people. The plumbing
system design includes storm and sewage outlines, plumbing assemblies, hot/cold
drinking water piping, and other niche equipment.
Once the particular
architectural, structural engineering drawings, and building services models
have been in place, they have to become merged and taken right into a clash
detection application as well as specialist interference-checking application,
for example Autodesk Navisworks. Any clashes as well as inconsistencies,
including the geometry-related difficult clashes, the clearance clashes, as well
as workflow clashes are discovered. Post clash detection, the combined services
versions and drawing sets need to be prepared to show exactly how MEP (M&E)
systems fit together within the same space.
As an effect, the MEP
(M&E) contractors and fabricators receive well-coordinated as well as
clash-free building services sketches on site, which drastically reduces the
amount of installation conflicts in the actual field. Additionally, MEP
(M&E) BIM coordination leads to more assemblies being prefabricated
off-site inside a controlled factory environment, which improves the logistical
circulation on site. Moreover, another positive results of BIM-driven MEP
(M&E) coordination physical exercise is relatively lesser quantity of
change orders and RFIs (request with regard to information).
All the above results
of mep coordination drawings help to
make the design-build process better by increasing project's routine compliance
whilst reducing style and construction-related rework.